NUTRA-BOND-PLUS / Water Application Guidelines
|
|
|
Example field calculation for 8cm lift |
|
Water to be added to reach optimum moisture compaction
|
|
|
Volume 8 cm x 8 Meters x = 640 Cubic Meters |
|
Material Weight 640 cu Meters x 1,600 Kg/Cu M = 1,024,000
Kg/liters |
|
Additional water needed to achieve optimum moisture (8% moisture x 1,024,000 liters) = 81,920 liters water |
|
Safety factor (avoids excess water) 70% x 81,920 l = 57,344
liters water |
| Nutra-Bond (1 liter treats 33 cu M of soil) |
|
Liters required =19 liters Nutra-Bond |
|
640 cu M road base material divided by 33 cu M |
| Nutra-Bond dilution rate this example only (DRY CONDITIONS)=
3,080:1 Nutra-Bond |
|
|
|
NUTRA-BOND-PLUS Dilution Table – water to be added
|
|
|
Water |
1% |
2% |
3% |
4% |
5% |
6% |
7% |
8% |
9% |
10% |
|
Water / liter / Nutra-Bond |
528 |
1056 |
1584 |
2112 |
2640 |
3168 |
3696 |
4224 |
4752 |
5280 |
|
70%
safety rule |
370 |
739 |
1109 |
1478 |
1848 |
2218 |
2587 |
2957 |
3326 |
3696 |
|
|
|
PROCEDURE |
|
- Determine (estimate) water to be added to soil, then determine capacity of
water truck and add NUTRA-BOND-PLUS according to dilution rate calculation
(estimate water slightly below amount needed).
- Apply water and NUTRA-BOND-PLUS to base material, wetting surfaces
evenly.
- Blend and mix NUTRA-BOND-PLUS and water into soil with grader blade or
recycler. Several passes may be required using a blade.
- Observe if road base material has enough moisture for compaction. (A hand
sample should make a firm ball.)
- If more moisture is needed, add plain water and re-blend.
- Compact material to maximum density, usually 5 to 8 passes.
- Repeat step 6 for the top lift (layer).
- If first lift surface is too dry, dampen with a small amount of water,
before the 2nd lift is extended across the road and compacted.
|
|